As you can
see on the map of our itinerary we travelled a different route from what I
announced in my last blog.
This issue
will be a lengthy one, but this years last one as well, as we made a U-turn in Hannover and then sailed back. More about that later.
In the
beginning of May we continued on the same waterway, now called the Neder-Rijn (Lower Rhine) instead of Lek.
Our next
stop was Arnhem
and – as you can see on this picture – it is not going to be one of our
favourite mooring stops.
|
|
Vitesse -
Arnhems local soccer club – had won the Cup Final which was extensively
celebrated, a big party and a tour of the city in an open coach with the
winning team. Unfortunately the rain was pouring down.
We had a nice
experience in Arnhem
as we suddenly received an email from a guy who lives quay side and looked down
on us from his window.
He had
looked us up, found our website and wrote just to tell us that he thought ‘t
Majeur looked well organised and adventurous, wishing us happy cruising.
A nice
thing to happen on a otherwise dreary day.
|
|
After Arnhem we sailed down the Gelderse IJssel, back on familiar
waters as we –a few years hence – had sailed up the IJssel and then continued
towards the Meuse river.
Back then
we had been lead to believe that we were too big for Zutphens local harbour, so
we had sailed past. In the meantime we have learned differently.
We did fit,
indeed, and provided a nice picture, being moored in Zutphens centre, but on a
jetty that was too small for us. All passing commercials made us rock heavily.
The next
day we found out that we were more than welcome in Zutphens historical harbour,
far better suited for bigger ships. It was a bit downstream but near the town
as well, so we moored there and toured the city.
more plush than dandelions |
We not only
toured the town but the surrounding country as well.
We came to
a field where you could see from afar that it was covered with dandelions but
we couldn’t make out the white flowers.
Coming
closer we found that they were all dandelion plush, never seen so many together
and a bit of wind would have blown all plush away.
It was a
matter of being on the right spot in the right time, a wondrous view.
welcome to the KWAK |
Just North
of Zutphen we turned right and, by way of Almelo,
cruised to the KWAK, (the Dutch acronymfor quack) the King William-Alexander Canal.
This is a
six kilometre canal, opened in 2013. It had been dug to easier admit pleasure
craft into the so called Veenkoloniƫn (Peat Colonies) and it also provides a
much shorter route for boats to Haren in Germany than via the Northern
approach via Ter Apel.
At the
canals entrance you’re greeted by a huge wooden giraffe, actually situated on
the highway, but not noticeably so.
several right angels and all very narrow |
Maximum
allowed ships length is 27
metres. So we just fit, having no problems with the
locks.
There are
though a few right angles, one just behind a bridge, but by careful manoeuvring,
using a big fender for a pivot, and lots of patience from the bridge keeper and
everyone that had to wait for the open bridge, we made it without a hitch.
It is a
beautiful route, taking you right through the nature reserve the Veenkoloniƫn
and even right through the middle of the Peat Museum where the days of old are
relived; you can moor there for the night but we carried on to Emmer
Compascuum. A name you typically know only from your schooldays but it appears to exist in reality and Michel
says it looks good on his curriculum, having been there.
once it must have been very busy here |
We then had to hurry a bit as it was May 14th and we had to meet the rest of our party – ships and skippers – on the 15th. That was the party we would spend a week with in Berlin.
From Emmer
Compascuum to Haren was a days cruise and we soon crossed the German border.
Not very exciting, only marked now by the old customs office and our – now - German
pennant.
|
|
Just behind
the last lock before Harens harbour there was a crowd of youngsters –
apparently a school outing – calling for us to take them aboard, their teacher
supporting them.
At a small
pontoon we could hoist them aboard and the 10 minute trip to the harbour was
their outings summit.
All other
ships were already moored, the Berlin
flotilla was complete and the first palaver could begin.
Next day
each of us, according to his own speed and timing, set course for the second
palaver in four days time: Minden on the Mittelland Canal.
The stretch
of the Dortmund-Ems-Canal leading South was not very interesting nature-wise
and a bit tedious due to many locks and lots of commercials, but there you are;
if you don’t have a Rhine “patent” (a license for cruising on the river Rhine
in Germany)
this route is the only option.
Peter and Michel in discussion with the police. We could not moore here but we could at the yellow arrow |
Once we
reached the Mittelland canal both the surroundings and the cruising improved;we
were joined by the Linquenda, a barge of our own size.
We were
soon to find out that we were in Germany where German rules &
regs reign.
We are used
to cruising in France and Belgium
and the main rule – when mooring outside marinas – is to take care that you are
moored safely, not hindering others. Not so in Germany, where mooring is only
permitted where it says it is permitted.
Not a wrong
approach, but there’s a myriad signs, all of them indicating something
different, that do not apply to all ships but only to certain categories, and
different lengths etc. etc.
Our first attempt
to moor went wrong straightaway.
We were
neatly moored, off the canal, just behind a sign that said we could and we had
made fast to yellow railings on the quay.
What we
didn’t know is, we were moored just opposite the Wasser Schutz Polizei, the
water police, present on all waterways.
The had
spotted us immediately and approached us straight away as it was ‘Verboten”
(forbidden).
We had
moored just past the sign, that should have been just before. We had used the
yellow railings, they were indicators that there were ladders which were
lifesavers for people that had fallen into the water. And it was completely
uninteresting and of no consequence that we blocked two yellow railings when we
moored a bit to the back (there are heaps of yellow railings and ladders).
The copper
was a nice guy and quite helpful in explaining the rules, but rules are rules
and so we were fined.
|
|
A nice spot
on the way was Bad Essen, a nice little town with beautiful houses and
well-known as a spa.
In the
village there is a public place where you can breath the salt air and steam.
The salted
earth is passed over weeds and twigs, that make up this mound, by means of
steam, very commendable for a cold.
In Minden we were all
together again, as good a reason as any for a get together where everybody
brought not only his own food and drinks, but tables and chairs as well.
all six boats in a row |
|
In MIiden the
Mittelland canal crosses the River Weser, sporting a beautiful building,
housing the locks. It is a so called Shaft-lock where you enter through a
tunnel. Thus the lower side door doesn’t have to go up all the way. Locks with
a serious difference in levels – here over 13 meters – are often
built like this.
To save water they built ponds on either side and a siphon system pumps the water into the pond or into the lock chamber.
At each
cycle some 7.300
cubic metres of water are saved out of 11.300,
depositing it in the ponds.
|
|
On Sunday
afternoon we happily cast off direction Hannover,
having to moor for the night before we got there. Linquenda moored just behind.
Next
morning our itinerary took a different turn because Michel woke up with limp left
arm.
Although
the possibility of a stroke didn’t cross our minds, the situation improved
quickly, we still thought it wise to visit a doctor in Hannover.
Whilst
cruising (Linquenda in keel line in case we should need help) we arranged for a
visit at a hospitals EU.
We moored,
got our bikes out and went to the hospital. After we waited for a solid five
hours and still nobody had attended Michel, we biked home again.
Next
morning Michel looked a bit worse but we cycled to a nearby GP. The man almost
had a fit himself when he heard all this and immediately packed Michel off to
a, different, hospital where he soon was admitted to the stroke unit and connected
to monitors. So it was a stroke after all.
After ten
days in hospital, lots of tests and examinations, Michel was released and by
now is recovering well.
Fright and
fear apart you also have to deal with all practicalities related to the boat
and with being admitted to a hospital abroad.
For this
blog I’ll dwell a bit on the first subject.
Almost
invariably we are moored on public quays, we are too big for marinas, don’t
need them for facilities and we don’t want to either.
That is an
okay setup when we are together an for a few nights only, but I didn’t feel
like it for an extended period, on my own, not feeling safe.
Sometimes
one is lucky, having friendly people around that supported and helped me.
Nearby our mooring there was a marina and the very day Michel was admitted the
only berth suitable for a big barge became vacant.
Linquenda’s
skipper took me and ‘t Majeur there and we could stay as long as was necessary.
My friends
stayed with me for a few more days and then continued their voyage to Berlin. The other four
had already carried on.
|
|
For us it
was quickly clear that we would return to Holland,
but when and how was a bit vague; we would stay in Hannover
meanwhile.
We were in
touch with lots of friends and family, a few even came over to Hannover, very important at times like these.
Michel had,
in hospital, quickly started his rehab.
I amused
myself with the many boats, all sorts and sizes, that passed and lots of
bicycle trips to the hospital.
|
|
|
After being
released from hospital we had to stay around for at least a fortnight, being
checked and all that, but amusement was at hand.
|
|
Although
Michel’s restrictions improved he was easily tired, it will take a long time
for that to improve.
So cruising
back would be a problem. Michel is needed as a skipper to cruise, I am just a
good mate, so just the two of us wouldn’t work out.
We could
ask for help from friends or family, but even then the trip would take several
weeks as we don’t have the licenses required for sailing the Rhine,
which is the shortest route.
Plus, it
would be a tiresome voyage and Michel needed to go back for rehab.
Our friends
from Liquenda had kindly offered us the use of their mooring, a spot in Utrecht’s centre. We had
to go back in any case, but this was not wrong!
After lots
of phone calls, acquiring information and deliberations the solution was found.
A former
professional skipper came over from Vreeswijk, together with his wife. They
sailed the boat and us in no time to Utrecht, ‘cause
now we could take the Rhine.
You can, on
the map, see the different routes we took on the way up and the return trip.
Distance
wise maybe not so much difference but it saved a lot of time. We would have
spent at least three weeks on the return voyage, now we were home in six days.
Long days, higher speeds because of less locks and bigger waterways.
|
|
Every
disadvantage has a flipside, here as well because we now had our own trip on
the Rhine.
|
We were
very pleased that the route we took was as interesting as the way up, lots to
see.
|
|
So far we
had not yet been on the Southern leg of the Amsterdam-Rhine Canal
so we were not familiar with the “plof-lock” phenomenon.
We sailed
straight at it, it is the huge concrete span on the picture above.
The
A-R-canal used to run straight underneath this building, now they have made a
detour.
Building
the A-R-canal (1933) had caused a breach in the Hollandse Waterlinie (it went
right through) which is a means of flooding large areas as a way of defending
the country. If there is a breach that is useless.
The
solution found was to replace the former sluice with a “plof-lock” near
Jutphaas. It is a concrete structure, having a relative weak belly that can
hold 40.000 tons of debris and such.
Should
during a war a decision be taken to flood the country then the bottom could be
ignited in order to close of the canal and the Water-Linie.
It would be
a rather irreversible, one time only action.
It never
happened and now the building is in use as a shooting gallery.
the plof-lock |
This years
barging season did not turn out the way we hoped and thought it would, but with
a little help from friends and family we are now moored in Utrecht on a nice
spot, winding down, all the care we need is available and there’s plenty of
things to do.
No way we
get bored and coming winter we will be in Amersfoort
again, pondering next years barging season.
Till then.
|
It still seems hard to believe that it is so much quicker to come back on the Rhine. But good. Also it is good that Michel can be patient and let others help so he can be back to full strength as soon as possible. Take care.
ReplyDelete